Skip to content

Testimonials

SSE

We engaged Bubble last year to supply, programme and commission a Siemens PLC control system. This system provides controlled cooling for an Electrical Generating system serving the Royal Navy Nuclear fleet out of The Royal Naval Devonport Dockyard in Plymouth . The system is critical to national security and was highly specified.

From the design side through software programming and commissioning Bubble provided a brilliant service and to be very fair went beyond their duties in so far as assisting with project management and liaison, not just with the Mechanical Contractor but also the clients personnel who highly prized their input with the overall design and importantly trouble shooting as unforeseen design issues have come up.
The project although not quite complete has been well received by all.
At present in the pipe line we have a number of other possible projects with Bubble .

Jon Jones TESGL SSE PLC

CTM Power

We, CTM, are a large Generator Company main factory based in Milan Italy and London office. We have employed Automation Programmers on Major Contracts, Royal Mail, Lambeth MPS, as our PLC specialist controls installer, we make the following observations on performance. 1. On all Contracts carried out they extremely professional and are very good positive team members. And know how on controls is excellent, 2. Working closely with CTM Project Supervisors in the production of detailed work programming. 3. User friendly Directors and Supervisors. 4. Installation and workmanship first class. 5. Willing to work closely to improve agreed programmers. 6. Not contractual Company. We are currently employing Bubble Automation on our large Doxford Neo Garage Project as our PLC specialist controls installer and endorse the above items 1to 6 on this Project. Should you require further information please contact the undersigned.

BOC Edwards

Dear Mr. Smith and Mr. Brimmer,

I writing to express our appreciation for you for the excellent work (Software development and Hardware installation) which you have carried out recently on our EM and IPX/EPX test facilities. Their reliabilities have increased significantly and they are no longer process bottlenecks.

I was impressed with your professionalism, flexibility and your adherence to the agreed schedules. The high standard of technical support we received during installation and commissioning facilitated keeping production disruptions to a minimum.

I have also received positive feedback from the shop floor operators which was very pleasing. In addition to the noticeable improvement in the reliability of the test facilities, they are very appreciative of the user-friendliness of the graphical user interface you developed.

It was a pleasure doing business with you.

Yours Sincerely Dr M Kalta – Senior Manufacturing Technologist

Regenesys Technologies Limited

OTEF Aberthaw Power Station The Leys Barry Vale of Glamorgan CF62 4Q1

I would also like to thank you for providing maximum flexibility in upgrading the essential control systems of the facility, which enabled day-to-day operations to continue through their normal programme of work.I write to express my thanks for your dedicated work with the Regenesys Technologies team based at Aberthaw during the last couple of years. We appreciated your reliability and knowledge in the field of PLC applications, and the enhancements made at Aberthaw through the introduction of a very user-friendly interface combined with an excellent graphics package.

It was great to work with you both and I wish you every success in your future assignments.

Yours sincerely,

GB.Simpson

Technology Evaluation Engineer – OTEF Manager